Construction

North Munn Avenue Bridge Over I-280

NJDOT’s $20.3 million, federally funded replacement of the North Munn Avenue Bridge decks and superstructure over Interstate 280 in East Orange. Steel in the span, orange barrier, dump trucks on the deck, live traffic in the lanes below. The Freeway Drive work zone meets North Munn Avenue — the same dirt the hyperlapse was shot from. Construction is scheduled through spring 2028.

What this capture was for.

NJDOT’s $20.3 million, federally funded replacement of the North Munn Avenue Bridge decks and superstructure over Interstate 280 in East Orange. Steel in the span, orange barrier, dump trucks on the deck, live traffic in the lanes below. The Freeway Drive work zone meets North Munn Avenue — the same dirt the hyperlapse was shot from. Construction is scheduled through spring 2028. Captured by Baron Aerial Media — planned around a usable output, not a stock plate.

NJDOT’s named project is the North Munn Avenue Bridge over I-280: demolish and reconstruct concrete decks, repair substructure and structural steel, replace bearings, rebuild the sidewalk, and add shoulders in both directions. Freeway Drive lane work at the North Munn Avenue intersection is part of the same jobsite. North Munn Avenue has been closed and detoured during steel work. Aerial nadir film is a 7.5 s hold from Jun 25. Ground film of crew and dump trucks is from the same jobsite. Promotional media for Embark and ShopRite at The Crossings is a separate packet.

A submitted brief starts a feasibility review. It does not authorize a flight, confirm a date, or create a contract. Conditions and approvals can change what is operationally possible.

Mission

Infrastructure progress — North Munn Avenue Bridge over I-280, East Orange

Outputs

Aerial film + ground film + stills

Category

Construction

Project

North Munn Ave Bridge over I-280

Owner

NJDOT · federally funded

Value

$20.3 million

Scope

Deck, superstructure, bearings, steel, sidewalk, shoulders

Schedule

Through spring 2028

Captured

Jun 24–28, 2026

Sensor

DJI FC3411

Plan a similar mission

Deliverable stills

Dump trucks on the steel deck of the North Munn Avenue Bridge reconstruction over I-280, orange barrier, highway lanes below
Dump trucks on the steel deck of the North Munn Avenue Bridge reconstruction over I-280, orange barrier, highway lanes below
Looking along the North Munn Avenue Bridge reconstruction — dump trucks, staging, and I-280 traffic on the same span
Looking along the North Munn Avenue Bridge reconstruction — dump trucks, staging, and I-280 traffic on the same span
Dump truck filling the frame on the Munn Avenue / I-280 reconstruction jobsite — orange barrier and construction fencing
Dump truck filling the frame on the Munn Avenue / I-280 reconstruction jobsite — orange barrier and construction fencing
Haul road and dump trucks in the dirt at Freeway Drive / North Munn Avenue, the approach to the I-280 bridge reconstruction
Haul road and dump trucks in the dirt at Freeway Drive / North Munn Avenue, the approach to the I-280 bridge reconstruction

Ground Film On The I-280 Jobsite

Crew, dump trucks, and the span from the dirt — twelve seconds at NJDOT’s North Munn Avenue Bridge replacement over I-280. Freeway Drive meets North Munn Avenue here. The Crossings at Brick Church Station stills from the same pass (Embark apartments and the new ShopRite) are a separate packet.

Open The Crossings at Brick Church Station stills →

Altitude Changes Everything

From Rooftops to Bottom Lines.

Tell us the site and the decision the media has to support. We will scope the flight, the deliverables, and whether it is operationally feasible under Part 107.

Plan a Drone Mission