North Munn Avenue Bridge Over I-280
NJDOT’s $20.3 million, federally funded replacement of the North Munn Avenue Bridge decks and superstructure over Interstate 280 in East Orange. Steel in the span, orange barrier, dump trucks on the deck, live traffic in the lanes below. The Freeway Drive work zone meets North Munn Avenue — the same dirt the hyperlapse was shot from. Construction is scheduled through spring 2028.
What this capture was for.
NJDOT’s $20.3 million, federally funded replacement of the North Munn Avenue Bridge decks and superstructure over Interstate 280 in East Orange. Steel in the span, orange barrier, dump trucks on the deck, live traffic in the lanes below. The Freeway Drive work zone meets North Munn Avenue — the same dirt the hyperlapse was shot from. Construction is scheduled through spring 2028. Captured by Baron Aerial Media — planned around a usable output, not a stock plate.
NJDOT’s named project is the North Munn Avenue Bridge over I-280: demolish and reconstruct concrete decks, repair substructure and structural steel, replace bearings, rebuild the sidewalk, and add shoulders in both directions. Freeway Drive lane work at the North Munn Avenue intersection is part of the same jobsite. North Munn Avenue has been closed and detoured during steel work. Aerial nadir film is a 7.5 s hold from Jun 25. Ground film of crew and dump trucks is from the same jobsite. Promotional media for Embark and ShopRite at The Crossings is a separate packet.
A submitted brief starts a feasibility review. It does not authorize a flight, confirm a date, or create a contract. Conditions and approvals can change what is operationally possible.
Mission
Infrastructure progress — North Munn Avenue Bridge over I-280, East Orange
Outputs
Aerial film + ground film + stills
Category
Construction
Project
North Munn Ave Bridge over I-280
Owner
NJDOT · federally funded
Value
$20.3 million
Scope
Deck, superstructure, bearings, steel, sidewalk, shoulders
Schedule
Through spring 2028
Captured
Jun 24–28, 2026
Sensor
DJI FC3411
Deliverable stills




Ground Film On The I-280 Jobsite
Crew, dump trucks, and the span from the dirt — twelve seconds at NJDOT’s North Munn Avenue Bridge replacement over I-280. Freeway Drive meets North Munn Avenue here. The Crossings at Brick Church Station stills from the same pass (Embark apartments and the new ShopRite) are a separate packet.
Open The Crossings at Brick Church Station stills →More work
Back to gallery →Altitude Changes Everything
From Rooftops to Bottom Lines.
Tell us the site and the decision the media has to support. We will scope the flight, the deliverables, and whether it is operationally feasible under Part 107.
Plan a Drone Mission